Economy6 November 20263 min read
Cabinet approves Rs 14,500 crore VGF scheme for grid-scale energy storage
The Union Cabinet has approved the Viability Gap Funding (VGF) Scheme for Development of Grid-Scale Energy Storage Systems, committing Rs 14,500 crore of support over FY 2026-27 to FY 2030-31. The scheme is meant to advance renewable energy integration, grid stability and long-term energy security.
It aims to create 92 gigawatt-hours (GWh) of new grid-scale storage capacity. That equals 170% of the grid-scale storage capacity India already has, and it contributes towards the country's target of 411 GWh by 2031-32.
How the 92 GWh is divided
The target is split across three kinds of technology. Hydro Pumped Storage Projects (PSPs) get the largest share at 60 GWh. Battery Energy Storage Systems (BESS) are allotted 30 GWh. The remaining 2 GWh is reserved for alternative or emerging energy storage technologies.
Projects will be allocated to both public and private sector electricity distribution companies (DISCOMs) through tariff-based competitive bidding. Putting DISCOMs at the centre of allocation ties the new capacity to the utilities that actually have to balance supply and demand. Bidding on tariff is meant to make developers compete on price.
Domestic content and the logic of viability gap funding
For BESS projects, the scheme sets a mandatory minimum Domestic Content Requirement (DCR) of 40%. The stated purpose is to reduce import dependence and promote indigenous production, in line with the Make in India push.
The government describes the scheme as demand-side financial support. It is designed to complement the supply-side incentives already in place for battery manufacturing, and so to strengthen India's domestic energy storage ecosystem. Put simply, manufacturing incentives help build the factories, while this scheme creates the buyers and projects that use their output.
Viability gap funding is a one-time capital grant from the government to infrastructure projects that are economically essential but financially unviable. Storage fits that description. Upfront investment is high and commercial returns are low. The grant bridges the gap, which is meant to attract private investment while keeping services affordable.
Why storage matters for a renewable-heavy grid
The government says the scheme is crucial for balancing electricity supply and demand. Renewable generation is variable. Storage can absorb that variability and release power when it is needed, which makes reliable round-the-clock (RTC) power supply possible without leaning heavily on conventional fossil fuels.
The scheme is expected to attract an estimated total investment of Rs 97,600 crore. The government says this will support India's transition towards a cleaner and more resilient electricity system.
For aspirants, the scheme touches several themes: the energy transition, fiscal support to make infrastructure bankable, the role of distribution utilities, and the link between clean energy deployment and domestic manufacturing.