Economy2 July 20263 min read
PMKSY completes over 10 years, with four components from large projects to drip irrigation
The Pradhan Mantri Krishi Sinchayee Yojana (PMKSY), launched on 1 July 2015, has completed more than 10 years. It was meant to widen farmers' access to water, expand the cultivable area under assured irrigation, improve water-use efficiency and promote water conservation. Its four components cover the irrigation chain from large projects to drip and sprinkler systems in the field.
How the scheme is designed
PMKSY is a Centrally Sponsored Scheme classified as a Core Scheme (Centrally Sponsored Scheme (Core Scheme)). Centre-State sharing is 60:40 for most States and 90:10 for North-Eastern and Himalayan States. Union Territories get full Central funding.
The scheme was formed by merging the Accelerated Irrigation Benefit Programme (AIBP) of the Ministry of Water Resources, River Development and Ganga Rejuvenation (now under the Ministry of Jal Shakti), the Integrated Watershed Management Programme of the Department of Land Resources in the Ministry of Rural Development, and On-Farm Water Management of the Department of Agriculture and Cooperation.
Its approach rests on Jal Sanchay, meaning rainwater storage, and Jal Sinchan, meaning efficient water application. The aim is that available water is stored, distributed and used efficiently at the farm level. Implementation is decentralised through State and District Irrigation Plans, which, the scheme says, help bring irrigation investments together at the field level and ensure location-specific water-use planning.
The Government approved continuation of the scheme for 2021–26 with an outlay of ₹93,068.56 crore. Union Budget 2026–27 allocated ₹6,587 crore.
Irrigation expansion components
The Accelerated Irrigation Benefit Programme focuses on rapid completion of ongoing major and medium irrigation projects, including national projects. Since 2016–17 it has received ₹21,023 crore in central assistance and benefited 17.30 million farmers, the largest coverage of any component.
In 2025–26 the Government approved Modernization of Command Area Development and Water Management (M-CADWM) as a sub-scheme of PMKSY-AIBP, with an initial outlay of ₹1,600 crore. It delivers water from major and medium projects through pressurised piped irrigation and micro-irrigation systems, improving last-mile delivery and field-level efficiency.
Har Khet Ko Pani creates new water sources through surface and groundwater-based minor irrigation and expands cultivable area under assured irrigation. Since inception, 3,462 Surface Minor Irrigation and Repair, Renovation and Restoration schemes have been completed, creating 5.93 lakh hectares of irrigation potential. Groundwater interventions added 88.55 thousand hectares.
Watershed and micro-irrigation components
Watershed Development aims to improve the productive potential of rainfed and degraded lands through integrated watershed management, soil and moisture conservation and sustainable management of natural resources. Since 2016–17 it has received ₹12,432.09 crore in central assistance and benefited 1.34 million farmers.
Per Drop More Crop promotes drip, sprinkler and other precision methods of applying water. It was part of PMKSY from 2015–16 to 2021–22. From 2022–23 it has been part of the Pradhan Mantri Rashtriya Krishi Vikas Yojana.
To encourage adoption, a Micro Irrigation Fund has been set up under the National Bank for Agriculture and Rural Development (Micro Irrigation Fund under NABARD). Small and marginal farmers receive 55% financial assistance for installing micro-irrigation systems, and other farmers receive 45%. Since its inception, Per Drop More Crop has brought 110.92 lakh hectares under micro-irrigation, about 7.98% of India's net sown area.